

| Inpuf and Oufput | |
| Input voliage | 12-24VDC |
| Input current | 20.5A |
| Output voltage | 12-24VDC |
| Output current | 1CH,20A |
| Output power | 240W/480W
(12V/24V) |
| Ouput ype | Constant volage |
| Dimming data | |
| Input signal | RF 2.4GHz
0/1-10V. Push Dim |
| Control distance | 15m(Gofod di-rwystr) |
| Dimming gray scale | 4096(2^12)levels |
| Dimming range | 0 -100% |
| Dimming curve | Logarithmic |
| PWM Frequency | 500Hz(default) |
| Diogelwch ac EMC | |
| safon EMC (EMC) | CHWILIAD EN 301 489-1 v2.2.3
CHWILIAD EN 301 489-17 v3.2.4 |
| Safon diogelwch(LVD | YN 62368-1:2020+A11:2020 |
| Offer Radio(COCH) | CHWILIAD EN 300 328 v2.2.2 |
| Ardystiad | HWN,EMC,LVD,COCH |
| Amgylchedd | |
| Tymheredd gweithredu | Ta: -30°C ~ +55°C |
| Case temperature (Max.) | T c:+85°C |
| Sgôr IP | IP20 |
| Warranty and Protection | |
| Gwarant | 5 blynyddoedd |
| Protection | Reverse polarity
Over-heat Over-load Short circuit |
| Pwysau | |
| Net weight | 0.234kg |
| Pwysau gros | 0.054kg |

| Mechanical Structures and Installations |

| Wiring Diagram |

| Note: The RF remote, 0/1-10V dimmer or Push switch can be connected at the same time,
which makes the product more user-friendly and more options to fit for some extra-ordinary demands. |
| Match Remote Control (two match ways)
|
|
| End user can choose the suitable match/delete ways. Two options are offered for selection:
|
|
| Use the controller’s Match key
Match: Short press match key, immediately press on/off key (single zone remote) or zone key (multiple zone remote) of the remote. The LED indicator fast flash a few times means match is successful. Delete: |
Use Power Restart
Match: Delete: |
0/1-10V Dimming
Push Dim Function The provided Push-Dim interface allows for a simple dimming method using commercially available non-latching (momentary) wall switchs.
Turn on or off light.
Press and hold to step-less dimming, With every other long press, the light level goes to the opposite direction.
Light returns to the previous dimming level when switched off and on again, even at power failure.
If more than one controller are connected to the same push switch, do a long press for more than 10s, then the system is synchronized and all lights in the group dim up to 100%. This means there is no need for any additional synchrony wire in larger installations. We recommend the number of controllers connected to a push switch does not exceed 25 pieces, The maximum length of the wires from push to controller should be no more than 20 meters.
Dimming Curve
|

| Light on/off fade time
Long press match key 5s, then short press match key 3 times, the light on/off time will be set to 3s, the indicator light blink 3 times. Light on/off fade time Long press match key 10s, restore factory default parameter, the light on/off time also restore to 0.5s. |
| Malfunctions Analysis & Troubleshooting |
| Malfunctions | Causes | Troubleshooting |
| No light | 1. No power.
2.Wrong connection or insecure. |
1.Check the power.
2.Check the connection. |
| Uneven intensity between front and rear,with voltage drop | 1. Output cable is too long.
2. Wire diameter is too small. 3.Overload beyond power supply capability. 4.Overload beyond controller capability. |
1.Reduce cable or loop supply.
2.Change wider wire. 3.Replace higher power supply. 4.Add power repeater. |
| No response from the remote | 1.The battery has no power.
2. Beyond controllable distance. 3.The controller did not match the remote. |
1. Replace battery.
2.Reduce remote distance. 3. Re-match the remote. |





| C1.ls ei fod yn iawn ar gyfer OEM a ODM ?
Mae goleuadau arfwisg yn broffesiynol ar gyfer gorchymyn OEM ac ODM. Mae gennym brofiad cyfoethog i fwrw ymlaen â'r cynhyrchiad a sicrhau ansawdd da.
C2.Beth yw'r MOQ? A allaf gael rhai samplau ? MOQ Isel, 1 pcs ar gyfer sampl gwirio ansawdd ar gael Mae archeb samplau yn dderbyniol ac yn croesawu'r samplau wedi'u haddasu ar gyfer eich prosiect.
Q3.How hir o'r amser Arweiniol? Anghenion sampl 3-5 dyddiau, mae angen gorchymyn maint 10-15 diwrnod
Q4.How ydych chi'n llongio'r nwyddau a pha mor hir mae'n ei gymryd i gyrraedd? Rydym fel arfer yn llongio gan DHL, UPS, FedEx neu TNT. Fel arfer mae'n cymryd 3-5 diwrnod i gyrraedd.Airlineand llongau môr hefyd yn ddewisol.
Q5.How i fwrw ymlaen â gorchymyn ar gyfer golau wedi'i addasu ? Yn gyntaf, gadewch i ni wybod eich gofynion neu drawing.Second, rydym yn dyfynnu yn ôl yourrequirements.Third, rydych yn cadarnhau ac yn trefnu taliad am archeb ffurfiol.Finally, byddwn yn cychwyn y cynhyrchiad ac yn trefnu cludo.
Q6.How hir ar gyfer y warant? Holl ansawdd cynhyrchion goleuadau Armor yw 3 blynyddoedd, lf cynhyrchion prosiect wedi'u haddasu gyda gwarant 5 mlynedd.
C7.ls mae'n iawn argraffu fy LoGo ar y cynnyrch ? Oes, rhowch wybod i ni yn ffurfiol cyn cynhyrchu a chadarnhewch y dyluniad yn gyntaf yn seiliedig ar ein sampl.
C8.Sut i ddelio â'r Diffygiol? Rydym yn cynnig 2, 3 a 5 gwarant cyfyngedig blwyddyn ar gyfer gwahanol fathau o gynhyrchion neu ofynion gwahanol prosiectau goleuo. Yn ystod y cyfnod hwn, os oes gan gwsmeriaid y prawfdangos materion ansawdd a bod y prawf hwnnw'n cael ei gymeradwyo gan beirianwyr goleuadau arfwisg, hoffem ddisodli'r rhai diffygiol gydag eitemau cymwys newydd. Sylwch nad yw gwarant yn hafal i hyd oes. Mae gan ein cynhyrchion oes fwy na 50000-awr.
Q9.Can l ymweld â'ch ffatri? Cadarn,croeso i ymweld â'n ffatri. Gall roi gwybod i ni eich amserlen ymweliad cyn dau ddiwrnod a'ch cynhyrchion â diddordeb.
Q10.Are chi ffatri neu gwmni masnachu? Rydym yn ffatri allforio yn uniongyrchol i farchnad dros y môr.
C11.Ydych chi'n cyflenwi goleuadau dan arweiniad i unrhyw siop frand enwog Goleuadau? Oes,roedd gan ein storfa dan arweiniad Lighting gyflenwad i LANCOME , LEGO,NESAF,HYFFORDDWR, Gwenynen Burt,Hasbro, Boots,BRAUN,M&S etc. |
Argymhelliad cynnyrch